How Is a Metal Roof Put On, Step by Step?
Here’s what happens, step by step, when a metal roof is installed, so you know what to expect and what to ask.
The short answer
A metal roof goes on in stages: the old roof is removed or prepared, the deck is checked and repaired, underlayment goes down, then edge trim, panels, flashing, and ridge caps are installed and fastened to the manufacturer’s instructions. Fastening details matter: the U.S. Department of Energy’s Building America Solution Center notes that clips set too far from the eave can let panels lift in wind. [1] In San Antonio, a roof replacement needs a permit. [2]
What are the steps?
From deck to ridge.
- Permit: pulled before work starts. [2]
- Tear-off or overlay decision: metal can often go over an existing roof, but the deck still needs checking. [3]
- Deck inspection: deteriorated decking gets replaced. [4]
- Underlayment: felt, synthetic, or self-adhered membrane. [4]
- Edge trim and starter: sets the line at the eaves.
- Panels: fastened with screws or clips per the manufacturer. [1]
- Flashing: around chimneys, walls, and pipes.
- Ridge caps and trim: close the top and edges.
- Clean-up and walkthrough.

Does the panel type change the process?
Exposed fastener vs standing seam.
| Type | How it’s fastened |
|---|---|
| Exposed-fastener (corrugated, ribbed) | Screws through the panel face |
| Standing seam | Hidden clips or fastening flanges under raised seams |
| Stone-coated steel | Interlocking panels fastened to the deck or battens |
See standing seam vs corrugated and standing seam installation.
Should you put on a metal roof yourself?
Safety and storms.
Roof work is dangerous. Falls are among the most common causes of serious work-related injuries and deaths, and OSHA requires fall protection in construction at six feet. [5] Fastening mistakes may not show until the first strong wind. [1]
See DIY vs professional metal roofing.
What RRSATX recommends
Ask your installer which manufacturer’s instructions they follow and how they fasten panels at the eaves and ridges.
Next steps: what you can do, and what needs a pro
Know the steps and ask about fastening.
You can safely:
- Confirm the permit.
- Ask about the deck.
- Ask about underlayment.
- Ask about fastening at the eaves.
Leave to a roofer: metal roof installation with a written workmanship warranty. RRSATX offers a free roof inspection with a photo report and a written estimate.
Local roofing service
About Affordable Roofing Contractors San Antonio
Affordable Roofing Contractors San Antonio, also known as RRSATX, is a father-and-son roofing business owned by Ted. Ted has 40 years of hands-on roofing experience. The company carries $2 million in liability insurance coverage. It offers free roof inspections and leak inspections, with no fee and no obligation, provides a photo report after the inspection, and gives a free written estimate before any work starts. If storm damage is involved, RRSATX can help as your roofer, not your adjuster: it can document damage and prepare an estimate, but it cannot act as a public insurance adjuster or negotiate a claim for you. [6] RRSATX provides a written workmanship warranty; this guide does not state its terms.
- Phone
- (713) 504-2341
- sales@affordableroofingcontractorssanantonio.com
- Address
- 4324 Monterey St, San Antonio, TX 78237
- Contact
- Request a free roof inspection
How a metal roof goes on: questions answered
Can metal go over shingles?
Often, per the Metal Roofing Alliance; the deck still needs checking. [3]
How long does a metal roof last?
Up to 50 years or more, per the Building America Solution Center. [1]
Is a metal roof noisy?
The Metal Roofing Alliance says there’s little difference from other materials. [3]
Do I need a permit?
Yes, in San Antonio. [2]