New Roof Installation in San Antonio

New Roof Installation In San Antonio | The 9-Step Process From Estimate To Cleanup

Home 9 Roof Replacement 9 New Roof Installation In San Antonio | The 9-Step Process From Estimate To Cleanup
New Roof Installation in San Antonio: The 9-Step Process From Estimate to Cleanup | Affordable Roofing Contractors San Antonio
Roof Installation Guide San Antonio, TX

Most San Antonio homeowners have no idea what actually happens between the moment they sign a roofing contract and the moment the crew drives away. This guide walks you through every step of a professional new roof installation so you know exactly what to expect, what to watch for, and how to tell whether the job is being done right.

New roof installation San Antonio 9-step process · Estimate to cleanup What to expect · Timeline · Inspection Residential · Asphalt shingles · San Antonio TX Updated 2026
R
Ted
With over 30 years of residential and commercial roofing experience across San Antonio and Bexar County, our crews have installed thousands of new roofs on homes throughout the area. Every guide we publish reflects real on-the-ground experience with Texas roofing conditions, not generic contractor advice written for a national audience.
· affordableroofingcontractorssanantonio.com · Licensed and Insured · $2M Liability Coverage · 100+ Five-Star Reviews
Part of our guide
How Much Does a Roof Replacement Cost in San Antonio?
1–3
Days for a complete residential roof installation on most San Antonio homes
9
Distinct steps in a professional roof installation from first estimate to final cleanup
30+
Years of San Antonio roofing experience behind every installation our crews perform
100%
Of proper installations include a final inspection and a written workmanship warranty

Replacing a roof is one of the largest home improvement investments most San Antonio homeowners will ever make. It is also one of the most misunderstood. The crew shows up, things get loud, and a day or two later the old roof is gone and a new one is in its place. But what actually happens during those hours matters enormously for how long your new roof will last and how well it will protect your home.

A roof installation done right follows a specific sequence of steps. Each one builds on the one before it. When a step is skipped or rushed, the result is not always obvious immediately. Problems show up months or years later as leaks, blown-off shingles, or premature failure. This guide walks you through all nine steps in the exact order they should happen on your San Antonio home so you know what a professional installation looks like from start to finish.

Why the process matters as much as the materials

The best shingles on the market will fail early if they are installed over a wet deck, without proper underlayment, or with the wrong nail pattern. The most common cause of premature roof failure in San Antonio is not material quality it is installation shortcuts. Understanding the correct process is the single best tool you have for evaluating whether a contractor is doing the job right before the problems appear.

New roof installation process San Antonio TX overview
A full residential roof replacement in San Antonio follows a strict 9-step sequence from the initial estimate through final cleanup and inspection.
● ● ●
The complete installation sequence every San Antonio homeowner should know
The 9-step roof installation process from your first estimate to the final nail sweep
01
The estimate and roof inspection what a real quote requires
A legitimate estimate starts on the roof, not from the driveway or a satellite image alone
Estimate

Every professional roof replacement starts with a proper inspection and a written estimate. This is not a formality. The inspection is where a qualified contractor assesses the condition of your existing roof, your decking, your ventilation system, your flashings, and any code requirements specific to your Bexar County property. The estimate that comes from that inspection should itemize materials, labor, disposal, and any identified repair work to the decking or flashing that will be needed once tear-off is complete.

Roofing contractor inspecting San Antonio home roof before estimate

What a proper estimate covers: Square footage of the roof, number of layers currently on the deck, decking condition, ventilation adequacy, flashing condition at all penetrations, and the full material specification including shingle brand, underlayment type, ridge vent or box vent plan, and drip edge requirements.

What should raise a red flag: A contractor who quotes your roof without getting on it, a quote that arrives within minutes of the first phone call, or a price that is significantly below every other bid you received. Low bids typically mean skipped steps or inferior materials.

Physical roof walk: No legitimate quote skips this Written scope: Every material and task itemized Decking condition: Assessed before tear-off is quoted Ventilation plan: Confirmed during the inspection
San Antonio note: Bexar County follows the International Residential Code and requires permits for most full roof replacements. A legitimate roofing contractor will pull the permit before work begins. If a contractor suggests skipping the permit to save money, that is a serious warning sign it shifts liability to you as the homeowner and can affect your ability to sell or insure the home.
Estimate checklist
  • Contractor physically walked the roof before submitting the quote
  • Written estimate received that itemizes materials, labor, disposal, and permit fees
  • Shingle manufacturer, product line, and warranty class specified in writing
  • Decking replacement allowance or pricing included if soft spots are likely
  • Timeline and crew size confirmed before signing the contract
  • Certificate of insurance and contractor license number received and verified
02
Permit pull and material delivery what happens before the crew arrives
Permits protect you legally; material staging on the roof protects your decking
Pre-Work

After you sign the contract and pay the deposit, two things happen before the installation crew sets foot on your roof: the permit is pulled with the City of San Antonio or Bexar County, and materials are ordered and delivered. Most roofing material deliveries in San Antonio are handled by a supply house that delivers directly to your property and uses a boom truck to load the shingles onto the roof itself. This keeps heavy pallets off your yard and positions materials close to where they will be installed.

Material staging on the roof is standard practice, but it needs to be done correctly. Shingle pallets placed on a roof that is about to be torn off add significant weight. A reputable crew accounts for this in how they plan the tear-off sequence so the decking is never overloaded. If you see materials stacked heavily over one section of an older home, it is appropriate to ask the crew lead about the load plan.

City permit: Required for full replacement in Bexar County Material delivery: Typically 1 to 3 days before installation Boom truck staging: Shingles loaded directly onto the roof Dumpster placement: Positioned for tear-off waste access
Homeowner tip

Before installation day, move vehicles out of the driveway and away from the home. Roofing debris, nails, and spent shingles fall off the edges of the home during tear-off. Vehicles parked close to the house are a common source of damage claims during roof replacements. Ask your contractor whether they use tarps around the perimeter to catch falling debris, and confirm whether a magnetic nail sweep will be included in the cleanup after the job is complete.

Pre-installation checklist
  • Permit number received from contractor and confirmed as pulled before work begins
  • Material delivery confirmed with specific shingle brand and color matching your selection
  • Vehicles moved away from the home and driveway cleared
  • Fragile items removed from walls inside the home hammer vibration is significant
  • Pets secured indoors or off the property on installation day
  • Neighbors notified of the installation date as a courtesy
Roofing crew setting up for tear-off on San Antonio residential home
Professional roofing crews in San Antonio set up perimeter tarps and dumpster access before tear-off begins to protect landscaping and catch falling debris.
03
Tear-off removing the old roof down to bare decking
A full tear-off is almost always the right call in San Antonio here is why layovers fail
Tear-Off

Tear-off is the process of removing all existing roofing material down to the bare wood decking. On most San Antonio residential roofs, this means pulling off the old asphalt shingles, the underlayment, and any existing drip edge. A proper tear-off exposes the full decking surface so the crew can inspect every board for rot, soft spots, delamination, and damage before anything new goes on top.

Some contractors offer a layover installation, also called a re-roof, where new shingles are installed directly over the existing layer without removing it first. While this is permitted under certain conditions in the building code, it is rarely the right choice for San Antonio homes. The Texas heat trapped beneath two layers of shingles accelerates the aging of both layers, voids most manufacturer warranties, and makes it impossible to inspect or repair the decking underneath. When we install a new roof, we always recommend a full tear-off.

Roof tear-off process exposing wood decking San Antonio

How long tear-off takes: On a standard San Antonio residential roof of 1,500 to 2,500 square feet, a crew of four to six can complete tear-off in three to five hours. Steeper pitches, multiple layers, and difficult access take longer. Tear-off and new installation are often completed in the same day on a straightforward ranch-style home.

What the crew is looking for during tear-off: Rotted or delaminated OSB or plywood decking, wet insulation in the sheathing, improper flashing installation from the previous job, and any areas where the roof structure shows signs of sagging or damage.

San Antonio climate note: Texas summers create extreme attic temperatures that can reach 160 degrees Fahrenheit or higher in under-ventilated spaces. Installing a new roof over an old one without addressing ventilation traps even more heat and significantly reduces the lifespan of the new shingles. A proper installation always includes a ventilation assessment during tear-off while the decking is visible.
Tear-off checklist
  • All roofing material removed down to bare decking not a layover installation
  • Perimeter tarps or catch systems in place before tear-off begins
  • Old nails removed or driven flat across the entire deck surface
  • Decking inspected by the crew lead before any new material is applied
  • Soft or rotted decking boards identified and priced for replacement
  • Debris loaded into the dumpster as work progresses not left on the ground
04
Decking inspection and repair the foundation every new roof is built on
Rotten or damaged decking discovered during tear-off must be replaced before any new material goes on
Decking

Once the old roofing material is stripped away, the crew has full access to the decking for the first time. This is one of the most important moments in the entire installation. The decking is the structural layer that everything else is attached to. New shingles nailed into rotted or delaminated OSB will not hold. Fasteners that miss solid wood or pull through soft sheathing create immediate leak points.

Decking problems are common on San Antonio homes, particularly around chimneys, skylights, plumbing vents, and anywhere a previous roof had a leak that was not addressed promptly. Even a slow, minor leak that went undetected for a season or two can saturate and weaken the sheathing boards beneath. A professional crew will walk the entire deck surface after tear-off, pressing on boards to check for softness and looking for discoloration or mold that signals moisture damage.

$75–125
per sheet
OSB or plywood decking replacement (per 4x8 sheet): Material and labor to remove the damaged sheet, cut the replacement to size, and secure it to the roof framing with appropriate fasteners. Most reroof jobs in San Antonio require 2 to 6 sheets of replacement decking on average.
$200–500
penetrations
Decking repair around penetrations (chimneys, vents, skylights): Localized damage at penetration points where previous flashing failures allowed water intrusion. Often requires custom-cut pieces to fit around the framing.
Pro tip

Ask your contractor to photograph any decking damage they find before repairing it. If your roof was replaced within the last 10 to 15 years, decking damage caused by a previous contractor's poor installation or flashing work may be the basis for a warranty or dispute claim. You want a documented record of what was found. A reputable San Antonio roofing company will provide this documentation as a matter of course without being asked.

Decking inspection checklist
  • Full deck walk completed by crew lead after tear-off before underlayment begins
  • Soft, rotted, or delaminated boards marked and photographed before replacement
  • Replacement decking is same thickness as original (typically 7/16" OSB or 1/2" plywood)
  • Replacement sheets secured with ring-shank nails into rafter framing not just into adjacent sheathing
  • All replacement decking is dry before underlayment is applied
  • Decking repair costs confirmed in writing before work proceeds to protect against surprise charges
05
Underlayment and ice and water shield the waterproof layer beneath the shingles
Underlayment is what protects your home if a shingle is ever blown off or damaged
Underlayment

Underlayment is the layer of material installed directly on the decking before the shingles go on. It serves as a secondary water barrier the defense layer that stands between your home and the elements if a shingle is ever damaged, blown off, or fails prematurely. In San Antonio, where severe thunderstorms can strip shingles and where summer heat accelerates material aging, quality underlayment is not optional.

There are three main underlayment types used in residential roofing: felt paper (15-lb or 30-lb asphalt felt), synthetic underlayment, and self-adhering ice and water shield membrane. Most San Antonio residential installations use a synthetic underlayment across the field of the roof, with ice and water shield applied in the vulnerable zones at eaves, in valleys, and around all penetrations.

Synthetic underlayment: Lighter, stronger, and more tear-resistant than felt paper Ice and water shield: Self-adhering membrane at eaves, valleys, and penetrations Felt paper (30-lb): Still used on some installations, less common in high-heat climates Coverage: Lapped and overlapped to prevent any exposed seams

Underlayment is installed starting at the eaves and working up the roof, with each row lapping over the one below by a minimum of 4 to 6 inches. Valley areas where two roof slopes meet get double coverage with ice and water shield self-adhered directly to the decking. Penetrations such as pipe boots, chimney bases, and skylight curbs are wrapped and sealed before the shingles cover them.

San Antonio weather note: While San Antonio does not face the ice dam conditions that make ice and water shield mandatory in northern climates, the membrane is still strongly recommended at eaves and valleys. San Antonio homes experience intense wind-driven rain during thunderstorms, and water blown laterally under shingle edges at eaves is a documented source of leaks on Texas roofs. The cost of ice and water shield at the vulnerable zones is minimal compared to the leak protection it provides.
Underlayment checklist
  • Synthetic underlayment or 30-lb felt specified not 15-lb felt on a full replacement
  • Ice and water shield applied at all eaves, valleys, and penetration points
  • Underlayment lapped correctly: bottom rows covered by rows above, minimum 4-inch overlap
  • Underlayment extends over the drip edge at the eaves and under the drip edge at the rakes
  • No tears, gaps, or exposed sections left in the underlayment before shingles begin
  • All pipe penetrations and chimney bases pre-wrapped and sealed before shingle installation
Underlayment installation on residential roof San Antonio TX
Synthetic underlayment is rolled out across the decking before shingles begin, providing a secondary water barrier across the entire roof surface.
06
Drip edge and flashing installation directing water away from the structure
Most roof leaks that appear in the first five years trace back to flashing that was installed wrong or skipped entirely
Flashing

Drip edge and flashing are the metal components that direct water away from vulnerable points on your roof. They are not glamorous, they are not visible from the street after the shingles go on, and they are the single most common source of roof leaks in San Antonio. Flashing done right keeps water out for the life of the roof. Flashing done wrong or skipped entirely creates the conditions for persistent, hard-to-trace leaks that often do not appear until the second or third rainy season.

Step flashing installation around chimney San Antonio roofing

Drip edge: A metal strip installed along the eaves and rake edges of the roof. It hangs over the fascia and directs water into the gutter rather than allowing it to wick back under the shingles or run down the fascia board. Drip edge is installed at the eaves before the underlayment and at the rakes after the underlayment. On a proper installation, the sequence is never reversed.

Step flashing: Installed at every vertical wall intersection where the roof meets a dormer wall, an addition, or any vertical surface. Each piece of step flashing is interwoven with the shingles as they are installed, with one piece per shingle course. Step flashing cannot be applied after the shingles are already on.

Chimney and skylight flashing: Full base and counter-flashing systems that seal the transition between the roofing surface and the masonry or framed curb. Counter-flashing is embedded into the masonry mortar on chimneys and covered with a bead of roofing sealant.

One of the most common shortcuts taken by less experienced contractors in San Antonio is applying a single piece of bent metal and a heavy bead of caulk at wall intersections instead of installing proper step flashing. The caulk looks fine on the day of installation. Within three to five years, it shrinks, cracks, and separates, allowing water to run directly behind the wall cladding and into the framing. Step flashing properly installed will outlast the shingles themselves.
Flashing checklist
  • New drip edge installed on all eaves and rake edges old drip edge always replaced
  • Eave drip edge installed before underlayment; rake drip edge installed after underlayment
  • Step flashing installed at every wall intersection, one piece per shingle course
  • New pipe boot flashings installed at every plumbing vent penetration
  • Chimney flashing includes a base and counter-flashing system not just sealant
  • Valley flashing installed in open or closed-cut configuration before shingles begin in the valley
07
Shingle installation the correct nailing pattern, exposure, and starter course
The visible part of the job is only as good as the nailing pattern and course alignment beneath it
Shingles

Shingle installation is what most homeowners think of when they picture a roof replacement, and it is genuinely impressive to watch an experienced crew lay courses quickly and accurately. But the speed of a skilled crew can also make it difficult for a homeowner to evaluate whether the installation is meeting manufacturer specifications. The details that determine the long-term performance of your new roof are the nailing pattern, the nail placement, the course alignment, and the starter strip installation at the eaves.

Every shingle manufacturer specifies a nailing pattern for their products. For most standard three-tab and architectural shingles, that means four nails per shingle placed within a defined nail zone on the shingle body. Nails placed too high above the nail zone are called "high nails" and represent one of the most common installation errors in the industry. A high-nailed shingle is not properly secured to the roof and is significantly more likely to be blown off during a San Antonio wind event.

Starter strip: Pre-cut shingles at the eave that seal the bottom edge Nail zone: Manufacturer-specified band where all nails must land 4-nail minimum: Required on most residential shingles 6-nail pattern: Required in high-wind zones and by some manufacturers Exposure: The amount of shingle face left uncovered by the row above Offset pattern: Vertical joints staggered to prevent water channeling

The starter course is the first row of shingles installed at the eave, and it plays a critical role in sealing the bottom edge of the roof. Proper starter strips are designed with a sealant strip that bonds the first full course of shingles to the roof surface. This is the point on the roof most exposed to wind lift. Without a properly installed starter course, wind can get under the bottom edge of the first shingle row and begin peeling the roof apart from the eave up.

What to watch

You can check nail placement without getting on the roof. Ask your contractor what nailing pattern they are using and whether it meets the manufacturer's specifications for the specific shingle product being installed. If they are using a nail gun, ask whether the depth setting has been confirmed a gun set too deep will drive nails through the shingle rather than flush against it, and a gun set too shallow will leave nail heads raised, which creates a leak point at every fastener.

Shingle installation checklist
  • Starter strip installed at eaves and rakes before the first full shingle course begins
  • All nails placed within the manufacturer-specified nail zone no high nailing
  • Minimum four nails per shingle; six nails if manufacturer or wind zone requires it
  • Nail gun depth confirmed: nails flush with shingle surface, not over- or under-driven
  • Course alignment verified with chalk line every several courses
  • Vertical joint offset maintained throughout no stacked joints running up the slope
Shingle installation in progress on San Antonio residential roof
Shingle courses are laid starting at the eave and working up the slope, with each row offset from the one below to eliminate vertical seam alignment.
08
Ridge cap, ventilation, and finish work closing the roof correctly
Ridge cap is the most wind-vulnerable shingle on the roof; ventilation balance determines how long the shingles last
Finish Work

Once the field shingles are complete, the crew finishes the ridge the highest point on the roof where the two opposing slopes meet. Ridge cap shingles are designed specifically for this purpose, with thicker body material and a pre-bent profile that conforms to the roof angle. They are nailed through both sides of the cap into the decking below and are the most exposed shingles on the entire roof, taking the full force of wind from any direction.

Alongside the ridge cap, the ventilation system for the roof is finalized at this stage. San Antonio homes require adequate exhaust ventilation at the ridge or eaves and intake ventilation at the soffit to create a continuous airflow path through the attic. Without proper ventilation, attic heat builds to the point where it cooks the shingles from the underside and dramatically shortens their effective lifespan.

Ridge cap shingles installed on completed roof San Antonio

Ridge cap options: Three-tab shingles cut into thirds and bent over the ridge (older method) or purpose-built hip and ridge cap shingles, which provide better coverage and a cleaner visual line. Most manufacturers require their own ridge cap product to maintain the full shingle warranty.

Ventilation options: Ridge vent is the preferred exhaust ventilation for San Antonio homes because it provides continuous ventilation along the full length of the ridge rather than relying on individual box vents placed at intervals. Ridge vents require corresponding soffit ventilation to function correctly.

Other finish details: All pipe boots sealed with a compatible sealant, all exposed nail heads on rake and starter edges covered, and any vent stacks trimmed and re-secured through the new roof surface.

Ventilation is one of the most overlooked elements of a San Antonio roof replacement, and it is one where homeowners are most likely to be shortchanged. Adding a ridge vent during a reroof costs relatively little it is far less expensive than replacing shingles that fail early because of heat buildup. Ask your contractor to calculate the net free area of ventilation for your home and confirm that the new roof meets the standard requirement of 1 square foot of ventilation for every 150 square feet of attic floor.
Ridge and ventilation checklist
  • Purpose-built hip and ridge cap shingles used not cut three-tabs
  • Ridge cap nails driven at the correct depth and covered by the overlapping cap
  • Ridge vent or box vents confirmed as part of the installation plan before work begins
  • Soffit vents confirmed unobstructed before installation is complete
  • Ventilation net free area calculated and confirmed as meeting code minimums
  • All pipe boots and penetration flashings sealed and confirmed watertight
09
Final inspection, cleanup, and warranty documentation how a professional job ends
The quality of the cleanup and inspection is one of the clearest signals of whether a contractor takes pride in their work
Final Step

The final stage of a professional roof installation covers three distinct activities: a thorough cleanup of the property, a final inspection of the completed work, and the delivery of your warranty documentation. All three matter, and none of them should be abbreviated.

Cleanup on a roofing job is more involved than most homeowners expect. Roofing debris torn-off shingles, old underlayment, spent nails, metal scraps from flashing work falls around the entire perimeter of the home during the project. A professional crew uses tarps to catch as much debris as possible during tear-off and loads it continuously into the dumpster throughout the day. At the end of the job, a thorough raking of the perimeter and a magnetic nail sweep of the lawn, driveway, and any paved areas around the home should be standard.

Magnetic nail sweep: Essential for driveways and lawns Gutter inspection: Debris flushed from gutters after tear-off Perimeter rake: Full sweep of landscaping and yard Final walk-through: Crew lead and homeowner inspect together Workmanship warranty: Separate from the manufacturer shingle warranty Permit sign-off: City inspection scheduled and passed

The final inspection should include a walk-through of the completed roof with the crew lead or project supervisor. Look for consistent shingle alignment, clean ridge cap installation, all penetrations properly sealed, and gutters clear of debris. After the city or county inspector signs off on the permit, you should receive your workmanship warranty document from the contractor and your manufacturer warranty registration if the installer is a certified contractor for that shingle brand.

1–2 yrs
minimum
Minimum workmanship warranty from a reputable San Antonio roofer: Covers installation defects, not material failures. Any contractor offering less than one year of workmanship coverage is not meeting industry standards.
10–30 yrs
shingle warranty
Manufacturer shingle warranty: Covers the shingle material itself, not the installation. Architectural shingles typically carry 30-year limited warranties. Impact-resistant shingles may carry lifetime warranties.
10–25 yrs
system warranty
System warranty (through certified contractors only): Some shingle manufacturers offer an enhanced system warranty that covers both the material and the workmanship when a certified installer uses their full product system. Ask your contractor whether they qualify.
Final inspection and cleanup checklist
  • Magnetic nail sweep completed on the driveway, lawn, and all paved surfaces
  • Gutters cleaned of debris from tear-off and installation
  • Full perimeter of the home raked and cleared of shingle debris and granules
  • Walk-through completed with crew lead before final payment is released
  • Workmanship warranty document received in writing with contractor contact information
  • Manufacturer shingle warranty registration confirmed either submitted by contractor or instructions provided
  • City or county permit inspection passed and sign-off received
● ● ●
Completed new roof installation on San Antonio home after professional replacement
A completed roof replacement on a San Antonio residential home clean ridge lines, consistent shingle alignment, and proper drip edge at every edge are the visible signs of a correctly installed roof.
What to expect and when
Roof installation timeline for a typical San Antonio residential home

The timeline below reflects a standard single-family home in San Antonio with an asphalt shingle installation on a moderately pitched roof of 1,500 to 2,500 square feet. Larger homes, steeper pitches, and more complex layouts take longer. This schedule assumes no significant decking replacement is needed.

Phase Typical timing What happens What you need to do
Estimate and contract Day 1 to 3 Roof inspection, written quote, contract signing, deposit Collect at least two written quotes; verify insurance and license
Permit and material order Day 4 to 10 Permit pulled, materials ordered and delivered to your property Confirm material delivery date; clear driveway and move vehicles
Installation day Day 11 to 14 (varies) Tear-off, decking repair, underlayment, flashing, shingles, ridge cap Secure pets; plan to be home if possible; driveway and yard cleared
Cleanup and inspection Same day as installation Property cleanup, nail sweep, walk-through with crew lead Walk the perimeter with the crew lead before paying the balance
Permit inspection Within 1 to 2 weeks City or county inspector visits and signs off on the permit Confirm with your contractor that the inspection has been scheduled
Warranty documents Within 1 to 2 weeks Workmanship warranty and manufacturer registration delivered File in a safe location with your home improvement records
● ● ●
Complete new roof installation checklist for San Antonio homeowners
Use this list to verify that every stage of your roof replacement is being done correctly
Before installation begins
  • Written contract received with full material specifications and scope of work
  • Contractor license and insurance certificate verified minimum $1M general liability
  • Permit confirmed as pulled with the City of San Antonio or Bexar County
  • Shingle brand, product line, and color confirmed in writing before materials are ordered
  • Decking replacement allowance included in the contract or a per-sheet price confirmed
  • Dumpster placed, vehicles cleared, and installation day confirmed
During installation
  • Tear-off completed to bare decking no layover installation
  • Decking inspected and damaged boards replaced before underlayment begins
  • Drip edge installed in correct order: eaves first before underlayment, rakes after
  • Ice and water shield applied at all eaves, valleys, and penetrations
  • Synthetic underlayment installed across the full field of the roof
  • Step flashing installed at every wall intersection during shingle installation
  • Nails placed within manufacturer nail zone no high nailing observed
  • Ridge cap installed with purpose-built hip and ridge cap shingles
  • Ventilation system confirmed as complete and balanced
After installation
  • Magnetic nail sweep completed on all paved surfaces and lawn areas
  • Gutters cleared of tear-off debris and granules
  • Full walk-through completed with crew lead before final payment
  • Workmanship warranty document received in writing
  • Manufacturer warranty registration confirmed
  • City or county permit inspection passed and sign-off received from contractor
● ● ●
Common questions answered
FAQs
Q
How long does a new roof installation take in San Antonio?
Most standard residential roof replacements in San Antonio are completed in a single day. A ranch-style home of 1,500 to 2,000 square feet with a moderately pitched roof and an experienced crew of four to six workers will typically have the old roof torn off and the new roof fully installed by late afternoon. Larger homes, two-story structures, steeper pitches, or roofs requiring significant decking replacement may take two days. Complex layouts with multiple valleys, dormers, or chimneys can extend the timeline further. Your contractor should give you a realistic estimate of the installation timeline before work begins.
Q
Do I need to be home during my roof replacement?
You do not need to be home during the installation, but being available by phone is important. Decking damage discovered after tear-off, a change in the ventilation plan, or any unexpected structural issue will require your authorization before the crew can proceed. If you cannot be home, designate someone who can make decisions on your behalf and ensure the contractor has a direct line to reach them. You should absolutely be home or available for the final walk-through at the end of the job, before you release final payment.
Q
What happens if it rains during my roof installation?
A professional roofing crew monitors the weather forecast carefully and will not begin a full tear-off if significant rain is expected during the installation window. If an unexpected storm develops mid-job, the crew will cover any exposed decking with tarps to protect it until conditions allow them to continue. Most San Antonio roofing contractors will not begin work if there is more than a 30 percent chance of rain in the forecast. Talk to your contractor about their rain protocol before the installation date, particularly during the summer storm season in San Antonio.
Q
How do I know if the roofers are nailing the shingles correctly?
You cannot easily verify nail placement from the ground while the installation is in progress, but there are things you can ask and observe. Ask the contractor to confirm the nail pattern they are using and whether it meets the manufacturer specification for the specific shingle product. Ask whether the nail gun depth setting has been confirmed before the job starts. At the end of the installation, you can look at the ridge cap installation properly installed ridge caps will show a consistent nail line with no raised nail heads visible along the cap edges. If you have concerns, you can request that the contractor perform a pull test on a sample shingle to confirm nail holding strength.
Q
How much extra should I budget for decking replacement during a San Antonio reroof?
A reasonable allowance for decking replacement on a San Antonio home is $300 to $600 for a typical job, which covers two to five sheets of damaged OSB or plywood at $75 to $125 per sheet including labor. Homes that have had unaddressed leaks, particularly at chimneys or around skylights, may have more extensive decking damage. Ask your contractor to include a per-sheet price for decking replacement in the contract so you know exactly what you will be charged if damaged boards are found during tear-off. Never accept a contractor who refuses to give you a unit price for decking before the job starts.
Q
What is the difference between a manufacturer warranty and a workmanship warranty on a new roof?
A manufacturer warranty covers the shingle material itself if the shingles fail due to a manufacturing defect within the warranty period, the manufacturer provides replacement material. A workmanship warranty covers the installation if the roof leaks because of how it was installed rather than because of a material defect, the contractor is responsible for the repair. These are two separate warranties from two separate parties. Every professional San Antonio roofing contractor should provide both. A workmanship warranty of less than two years is below industry standard. Some manufacturers also offer enhanced system warranties that combine material and workmanship coverage when a certified contractor installs their full product system.